Lexington School Building Committee backs Option Four for new high school exterior
LEXINGTON -- June 22, 2026, Lexington School Building Committee narrows high school exterior to Option Four red brick design. The committee reached consensus at its June 22 special meeting in favor of Option Four, a full-height red brick scheme that eliminates the lighter buff-colored base band previously featured in Option One, the original design submitted to the Massachusetts School Building Authority. Chair Kathleen Lenihan polled all twelve voting members and found a clear majority, including members Chuck Palazzo, Carolyn Kosnoff, John Himmel, Julie Hackett, Mark Barrett, Mike Cronin, Joe Patto, and Steve Bartha, in the Option Four column, with Andrew Baker and member Dan preferring variations closer to Option One or a hybrid. No formal roll-call vote was recorded; Lenihan declared the direction by consensus. The committee directed architect SMMA to return with a cost comparison for porcelain tile versus metal panel at the stairwell accents, a refined study of the textured Flemish-bond brick on the building's end walls, and a possible limited lighter-color treatment at the Worthen Road arcade entry, all refinements that must be resolved before the structural steel package issues in August in support of a September 2029 building opening.
Members read the rest of this story and every Lexington meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this story
Know someone in Lexington who follows town government? Share Townbrief Lexington: they can sign up free.